Page 10 Installation Instructions
WMK-027
Base Box Installation
Base Box
M6 x 12mm Screws
Step 1. Raise the base box projector mount to the upper mounting bracket.
Step 2. Align the two (2; one each side) mounting holes.
Step 3. Using a screwdriver/security wrench, insert and tighten two (2) M6 x 12mm security head screws. Do not over tighten the
screws.
Step 4. Attach the projector to the base box, referring to the PDS-PLUS Installation Instructions for nal adjustments.
Please review the Operators Manual that
came packaged with the PDS-PLUS before
attaching the PDS-PLUS to the upper mounting
bracket.
Security Wrench
Projector Mount
Extension Arm Installation (Optional)
Step 1. Slide the extension arm into the open end of the WMK-027 (the front of the mount).
Step 2. Attach the upper mounting bracket directly to the extension using two (2) M6 x 12mm set screws (see page 8).
Step 3. Adjust length so that the center of the upper mounting bracket matches the throw distance calibration.
Step 4. Line up the mounting holes on the extension arm with the mounting slots on the WMK-027.
Step 5. Using a screwdriver, insert and tighten two (2) M6 x 12mm security head screws, 1/4” at washers and 1/4” nylon spacers.
Step 6. Attach the PDS-PLUS (see page 10).
M6 x 12
Security Screw
Security
Wrench
1/4” Flat
Washers
Upper
Mounting
Bracket
WMK-027
If the extension arm was purchased at a later date, the end cover must be removed prior to installing the extension arm.
Please see the Operators Manual to determine the correct throw distance (the distance from the projector to the screen)
must be determined prior to mounting the projector.
1/4” Nylon
Spacer
Extension Arm